ADR-006 Split Readiness Pack ​

Status: Working guidance (non-normative) Source of truth: ADR-006, ADR-007, ADR-004, ADR-001, Manifesto Constitution (CLAUDE.md)

This document records split-readiness verdicts under locked owner decisions (A2, B3, C1, D1).

1. Locked Baseline ​

The following remain fixed until superseded by a new ADR:

  1. @manifesto-ai/app remains canonical public entry throughout Phase 1.
  2. Runtime/SDK specs remain Draft, with kickoff-lock profile and requirement ID stability.
  3. Kickoff threshold remains A2: 3/5 with mandatory CAN-2, CHAN-2, selected third CAN-4.
  4. Transition direction remains B3 + C1: SDK-first is Phase 2 end-state after two-phase compatibility rollout.
  5. Supersede scope remains D1: only kickoff-blocking clauses are superseded.

2. Owner Decision Record ​

Decision record locked on 2026-02-14:

  • [x] Decision A: A2 (partial gate relaxation: 3/5 with mandatory CAN-2, CHAN-2, selected third CAN-4)
  • [x] Decision B: B3 (SDK-first is target end-state)
  • [x] Decision C: C1 (two-phase compatibility release)
  • [x] Decision D: D1 (minimal supersede)

3. Gate Status Summary ​

Kickoff Gate (A2) ​

GateRole in A2 policyCurrent StateVerdict
CAN-2MandatoryClosedMet
CHAN-2MandatoryClosedMet
CAN-4Selected thirdClosedMet

Kickoff Verdict: Allowed.

Pre-Alpha Exit Gate ​

GateExit ConditionCurrent StateVerdict
PUB-3publish boundary stress coverageClosedMet
CHAN-1governance-vs-telemetry event-surface contractClosedMet
Architecture reviewrole-based sign-offApprovedMet

Pre-Alpha Exit Verdict: Closed.

4. Architecture Review Sign-Off (Role-Based) ​

RoleStatusDateReview ReferenceReviewer (Optional)
Docs OwnerApproved2026-02-14docs/internals/adr/006-evidence-matrix.md, docs/internals/adr/006-split-readiness-pack.md-
Architecture OwnerApproved2026-02-14docs/internals/adr/007-sdk-runtime-split-kickoff.md, docs/internals/adr/006-runtime-reframing.md-
Package Owners (App/World)Approved2026-02-14packages/app/src/__tests__/publish-boundary-stress.test.ts, packages/app/src/__tests__/persist-stage.test.ts, packages/world/src/world.test.ts-

Reference baseline commit: 47f813b (A2 kickoff lock).

5. Phase Boundary (B3/C1 Guardrails) ​

Phase 1 (Current) ​

  • Official entry point remains @manifesto-ai/app.
  • Runtime/SDK remain development baseline and internal/preview context.
  • Public SDK-first migration messaging is still withheld.

Phase 2 (Transition) ​

  • SDK-first public transition is allowed only after pre-alpha exit gate closure.
  • This document now records those closure conditions as met.

6. Phase 2 Transition Verdict ​

Decision Matrix ​

ConditionRequiredCurrentResult
PUB-3 closedYesYesPass
CHAN-1 closedYesYesPass
Architecture review approvedYesYesPass

Verdict ​

Go (Phase 2 transition planning unlocked).

Notes:

  1. This verdict fixes governance readiness only.
  2. Actual SDK-first public documentation switch and package extraction execution remain out of current scope.

7. Minimal Supersede Scope (D1) ​

Superseded scope remains limited to kickoff timing blockers:

  1. ADR-004 §7.4 kickoff-blocking interpretation
  2. ADR-006 §5 strict kickoff deferral clauses tied to split start timing

Not superseded:

  • ADR-001 layer principles
  • PUB/CHAN/CAN normative rules in ADR-006

Detailed implementation and test traceability: